The Project

It's time to re-build
 

Scope of Works

Re-plumb, re-tank and re-tile the main pool, toddlers pool and in ground spa pool. Replace the motorised under ground pool cover. Add a wheel chair accessible ramp to the main pool, and re-concrete the entire pool surround. A total re-build.

Why?

The underground pipes are leaking costly heated water, causing erosion. The concrete and pool are consequently slumping, and getting worse with time. The grout is degraded, the tiles fall off, and we can’t keep the pool warm overnight without a functioning cover. These repairs will save thousands of dollars on electricity, water treatment and pool maintenance every year, for many years to come. The rebuilt pools will last at least 30 years. 

How?

We have support from funding agencies. But we need to raise a sum ourselves. There are 1000 houses in Albert Town and if each gave $50, we could raise $50,000. Do you come to the pool as a member and bring guests?  Why not encourage your guests to donate too? All donations are tax deduuctible, or you can opt in too donate your tax rebate too.  

Thanks for your help!  We can't do it without You.

READY TO DONATE?

rpcf qr.png